SPP request GEN-2024-247

SPP queue ID GEN-2024-247

Queue request GEN-2024-247 was listed in the SPP interconnection queue at the end of 2025 as a 456.6 MW gas project in Payne County, OK, according to Berkeley Lab’s queue data file. The filing names Stillwater Northtap Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2030.

Queue IDGEN-2024-247
Project nameNot reported
Status (as published)Active
SubstationStillwater Northtap Substation
Point of interconnectionStillwater Northtap 138 kV Substation
CountyPayne
StateOK
Voltage138 kV
Capacity456.6 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2030-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Payne, OK: 4 requests in the SPP queue, 4 active totaling 883.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGRDA
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.