SPP request GEN-2024-236
SPP queue ID GEN-2024-236
Queue request GEN-2024-236 was listed in the SPP interconnection queue at the end of 2025 as a 241.4 MW wind project in Okfuskee County, OK, according to Berkeley Lab’s queue data file. The filing names Seminole - Muskogee line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.
| Queue ID | GEN-2024-236 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Seminole - Muskogee line |
| Point of interconnection | Seminole - Muskogee 345 kV line |
| County | Okfuskee |
| State | OK |
| Voltage | 345 kV |
| Capacity | 241.4 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2029-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Okfuskee, OK: 6 requests in the SPP queue, 2 active totaling 358.4 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OGE |
|---|---|
| Cluster | DISIS-2024-001; 04 SOUTHEAST |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | System Impact Study |
| Study phase (as the queue printed it) | DISIS STAGE |
| Queue date | 2025-03-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.