SPP request GEN-2024-236

SPP queue ID GEN-2024-236

Queue request GEN-2024-236 was listed in the SPP interconnection queue at the end of 2025 as a 241.4 MW wind project in Okfuskee County, OK, according to Berkeley Lab’s queue data file. The filing names Seminole - Muskogee line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.

Queue IDGEN-2024-236
Project nameNot reported
Status (as published)Active
SubstationSeminole - Muskogee line
Point of interconnectionSeminole - Muskogee 345 kV line
CountyOkfuskee
StateOK
Voltage345 kV
Capacity241.4 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2029-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Okfuskee, OK: 6 requests in the SPP queue, 2 active totaling 358.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.