SPP request GEN-2024-228

SPP queue ID GEN-2024-228

Queue request GEN-2024-228 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW solar project in Rice County, KS, according to Berkeley Lab’s queue data file. The filing names Rice to Circle Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 15, 2030.

Queue IDGEN-2024-228
Project nameNot reported
Status (as published)Active
SubstationRice to Circle Line
Point of interconnectionRice to Circle 230 kV Line
CountyRice
StateKS
Voltage230 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-09-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Rice, KS: 2 requests in the SPP queue, 2 active totaling 215.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMIDW
ClusterDISIS-2024-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.