Substation Scout

SPP request GEN-2024-181

SPP queue ID GEN-2024-181

Queue request GEN-2024-181 was listed in the SPP interconnection queue at the end of 2025 as a 199 MW battery project in Greene County, MO, according to Berkeley Lab’s queue data file. The filing names Brookline Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 15, 2029.

Queue IDGEN-2024-181
Project nameNot reported
Status (as published)Active
SubstationBrookline Substation
Point of interconnectionBrookline 161 kV Substation
CountyGreene
StateMO
Voltage161 kV
Capacity199 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-01-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Greene, MO: 7 requests in the SPP queue, 4 active totaling 819 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPRM
ClusterDISIS-2024-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.