SPP request GEN-2024-072

SPP queue ID GEN-2024-072

Queue request GEN-2024-072 was listed in the SPP interconnection queue at the end of 2025 as a 160 MW solar project in Mitchell County, KS, according to Berkeley Lab’s queue data file. The filing names Beloit Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2029.

Queue IDGEN-2024-072
Project nameNot reported
Status (as published)Active
SubstationBeloit Substation
Point of interconnectionBeloit 115 kV Substation
CountyMitchell
StateKS
Voltage115 kV
Capacity160 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mitchell, KS: 1 request in the SPP queue, 1 active totaling 160 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySUNC
ClusterDISIS-2024-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2024-10-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.