Substation Scout

SPP request GEN-2024-071

SPP queue ID GEN-2024-071

Queue request GEN-2024-071 was listed in the SPP interconnection queue at the end of 2025 as a 75 MW hybrid project in Cass County, TX, according to Berkeley Lab’s queue data file. The filing names West Atlanta - Atlanta Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 1, 2027.

Queue IDGEN-2024-071
Project nameNot reported
Status (as published)Active
SubstationWest Atlanta - Atlanta Line
Point of interconnectionWest Atlanta - Atlanta 69 kV Line
CountyCass
StateTX
Voltage69 kV
Capacity75 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cass, TX: 2 requests in the SPP queue, 1 active totaling 75 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2024-10-30
Components (hybrid)Solar 75 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first