Substation Scout

SPP request GEN-2023-SR4

SPP queue ID GEN-2023-SR4

Queue request GEN-2023-SR4 was listed in the SPP interconnection queue at the end of 2025 as a 170 MW battery project in Burke County, ND, according to Berkeley Lab’s queue data file. The filing names Tande Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2026.

Queue IDGEN-2023-SR4
Project nameNot reported
Status (as published)Active
SubstationTande Substation
Point of interconnectionTande 345 kV Substation
CountyBurke
StateND
Voltage345 kV
Capacity170 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tande Substation substation: 2 requests in the SPP queue, 1 active totaling 170 MW.

Queue IDProjectMWResourceStatus
GEN-2022-SR1Not reported104.4BatteryWithdrawn

Burke, ND: 4 requests in the SPP queue, 2 active totaling 372 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityBEPC
ClusterSurplus; 01 NORTH
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2022-12-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.