SPP request GEN-2023-SR16

SPP queue ID GEN-2023-SR16

Queue request GEN-2023-SR16 was listed in the SPP interconnection queue at the end of 2025 as a 70 MW battery project in Woodward County, OK, according to Berkeley Lab’s queue data file. The filing names Tap Mooreland to Woodward Line (FPLSwitch Substation) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2025.

Queue IDGEN-2023-SR16
Project nameNot reported
Status (as published)Active
SubstationTap Mooreland to Woodward Line (FPLSwitch Substation)
Point of interconnectionTap Mooreland to Woodward 138 kV Line (FPLSwitch 138 kV Substation)
CountyWoodward
StateOK
Voltage138 kV
Capacity70 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2025-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Woodward, OK: 40 requests in the SPP queue, 13 active totaling 2,028.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2023-04-26
Operational date2025-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.