SPP request GEN-2023-GR2

SPP queue ID GEN-2023-GR2

Queue request GEN-2023-GR2 was listed in the SPP interconnection queue at the end of 2025 as a 94.2 MW gas project in Oklahoma County, OK, according to Berkeley Lab’s queue data file. The filing names Tinker Air Force Base as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2026.

Queue IDGEN-2023-GR2
Project nameNot reported
Status (as published)Active
SubstationTinker Air Force Base
Point of interconnectionTinker Air Force Base 138kV
CountyOklahoma
StateOK
Voltage138 kV
Capacity94.2 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2026-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Oklahoma, OK: 33 requests in the SPP queue, 19 active totaling 5,200.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterReplacement; 04 SOUTHEAST
Interconnection serviceERIS
Project typeReplacement
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2023-02-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.