Substation Scout

SPP request GEN-2022-238

SPP queue ID GEN-2022-238

Queue request GEN-2022-238 was listed in the SPP interconnection queue at the end of 2025 as a 150 MW battery project in Pottawatomie County, OK, according to Berkeley Lab’s queue data file. The filing names Maud substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 15, 2028.

Queue IDGEN-2022-238
Project nameNot reported
Status (as published)Active
SubstationMaud substation
Point of interconnectionMaud 138 kV substation
CountyPottawatomie
StateOK
Voltage138 kV
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-09-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Maud substation substation: 2 requests in the SPP queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
GEN-2022-237Not reported150SolarWithdrawn

Pottawatomie, OK: 2 requests in the SPP queue, 1 active totaling 150 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2022-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-02-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first