SPP request GEN-2021-077

SPP queue ID GEN-2021-077

Queue request GEN-2021-077 was listed in the SPP interconnection queue at the end of 2025 as a 95 MW hybrid project in Pettis County, MO, according to Berkeley Lab’s queue data file. The filing names Windsor to AEC Sedalia as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDGEN-2021-077
Project nameNot reported
Status (as published)Active
SubstationWindsor to AEC Sedalia
Point of interconnectionWindsor to AEC Sedalia 161 kV
CountyPettis
StateMO
Voltage161 kV
Capacity95 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pettis, MO: 2 requests in the SPP queue, 1 active totaling 95 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGMO
ClusterDISIS-2021-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2021-04-30
Components (hybrid)Solar 95 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.