Queue request GEN-2021-005 was listed in the SPP interconnection queue at the end of 2025 as a 350 MW battery project in Saline County, KS, according to Berkeley Lab’s queue data file. The filing names Summit substation in Saline County, KS as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2030.

Queue IDGEN-2021-005
Project nameNot reported
Status (as published)Active
SubstationSummit substation in Saline County, KS
Point of interconnectionSummit 345 kV substation in Saline County, KS
CountySaline
StateKS
Voltage345 kV
Capacity350 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Saline, KS: 3 requests in the SPP queue, 2 active totaling 599.3 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2021-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2021-05-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.