SPP request GEN-2020-069

SPP queue ID GEN-2020-069

Queue request GEN-2020-069 was listed in the SPP interconnection queue at the end of 2025 as a 52.9 MW wind project in Cherry County, NE, according to Berkeley Lab’s queue data file. The filing names Cody to Valentine line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2025.

Queue IDGEN-2020-069
Project nameNot reported
Status (as published)Active
SubstationCody to Valentine line
Point of interconnectionCody to Valentine 115kV line
CountyCherry
StateNE
Voltage115 kV
Capacity52.9 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2025-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cherry, NE: 6 requests in the SPP queue, 1 active totaling 52.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
ClusterDISIS-2020-001; 02 NEBRASKA
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2020-04-24
Operational date2025-11-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.