SPP request GEN-2020-011

SPP queue ID GEN-2020-011

Queue request GEN-2020-011 was listed in the SPP interconnection queue at the end of 2025 as a 320 MW hybrid project in Phelps County, NE, according to Berkeley Lab’s queue data file. The filing names Axtell Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2028.

Queue IDGEN-2020-011
Project nameNot reported
Status (as published)Active
SubstationAxtell Substation
Point of interconnectionAxtell 345 kV Substation
CountyPhelps
StateNE
Voltage345 kV
Capacity320 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Phelps, NE: 1 request in the SPP queue, 1 active totaling 320 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
ClusterDISIS-2020-001; 02 NEBRASKA
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2020-04-08
Components (hybrid)Solar 320 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.