SPP request GEN-2019-039

SPP queue ID GEN-2019-039

Queue request GEN-2019-039 was listed in the SPP interconnection queue at the end of 2025 as a 174.5 MW solar project in Butler County, NE, according to Berkeley Lab’s queue data file. The filing names Columbus Southeast-Rising City as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDGEN-2019-039
Project nameNot reported
Status (as published)Active
SubstationColumbus Southeast-Rising City
Point of interconnectionColumbus Southeast-Rising City 115kV
CountyButler
StateNE
Voltage115 kV
Capacity174.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Butler, NE: 5 requests in the SPP queue, 1 active totaling 174.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
ClusterDISIS-2019-001; 02 NEBRASKA
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2019-05-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.