SPP request GEN-2019-012
SPP queue ID GEN-2019-012
Queue request GEN-2019-012 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Woodward County, OK, according to Berkeley Lab’s queue data file. The filing names Woodward substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2027.
| Queue ID | GEN-2019-012 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Woodward substation |
| Point of interconnection | Woodward 345kV substation |
| County | Woodward |
| State | OK |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2027-05-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Woodward, OK: 40 requests in the SPP queue, 13 active totaling 2,028.4 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OGE |
|---|---|
| Cluster | DISIS-2019-001; 04 SOUTHEAST |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | IA FULLY EXECUTED/ON SCHEDULE |
| Queue date | 2019-05-22 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.