Queue request GEN-2017-222 was listed in the SPP interconnection queue at the end of 2025 as a 180 MW wind project in Crawford County, IA, according to Berkeley Lab’s queue data file. The filing names Denison Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2027.

Queue IDGEN-2017-222
Project nameNot reported
Status (as published)Active
SubstationDenison Substation
Point of interconnectionDenison 230kV Substation
CountyCrawford
StateIA
Voltage230 kV
Capacity180 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2027-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Denison Substation substation: 2 requests in the SPP queue, 2 active totaling 252 MW.

Queue IDProjectMWResourceStatus
GEN-2018-074Not reported72WindActive

Crawford, IA: 2 requests in the SPP queue, 2 active totaling 252 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWAPA
ClusterDISIS-2017-002; 01 NORTH
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2017-11-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.