Queue request GEN-2017-175 was listed in the SPP interconnection queue at the end of 2025 as a 270 MW wind project in Turner County, SD, according to Berkeley Lab’s queue data file. The filing names Vfodnes-Utica Jct. as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2028.

Queue IDGEN-2017-175
Project nameNot reported
Status (as published)Active
SubstationVfodnes-Utica Jct.
Point of interconnectionVfodnes-Utica Jct. 230kV
CountyTurner
StateSD
Voltage230 kV
Capacity270 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Turner, SD: 1 request in the SPP queue, 1 active totaling 270 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWAPA
ClusterDISIS-2017-002; 01 NORTH
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2017-11-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first