Substation Scout

SPP request GEN-2017-094

SPP queue ID GEN-2017-094

Queue request GEN-2017-094 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW wind project in Hand County, SD, according to Berkeley Lab’s queue data file. The filing names Fort Thompson-Huron as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 1, 2023.

Queue IDGEN-2017-094
Project nameNot reported
Status (as published)Operational
SubstationFort Thompson-Huron
Point of interconnectionFort Thompson-Huron 230 kV
CountyHand
StateSD
Voltage230 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2023-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hand, SD: 2 requests in the SPP queue, 1 active totaling 200 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWAPA
ClusterDISIS-2017-001; 01 NORTH
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2017-05-24
Operational date2023-11-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first