SPP request GEN-2016-037

SPP queue ID GEN-2016-037

Queue request GEN-2016-037 was listed in the SPP interconnection queue at the end of 2025 as a 300 MW wind project in Washita County, OK, according to Berkeley Lab’s queue data file. The filing names Chisholm-Gracemont as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2022.

Queue IDGEN-2016-037
Project nameNot reported
Status (as published)Operational
SubstationChisholm-Gracemont
Point of interconnectionChisholm-Gracemont 345kV
CountyWashita
StateOK
Voltage345 kV
Capacity300 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2022-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Washita, OK: 8 requests in the SPP queue, 3 active totaling 524 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2017-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2016-03-31
Operational date2023-03-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.