Substation Scout

SPP request GEN-2015-069

SPP queue ID GEN-2015-069

Queue request GEN-2015-069 was listed in the SPP interconnection queue at the end of 2025 as a 300 MW wind project in Dickinson County, KS, according to Berkeley Lab’s queue data file. The filing names Union Ridge as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 17, 2018.

Queue IDGEN-2015-069
Project nameNot reported
Status (as published)Operational
SubstationUnion Ridge
Point of interconnectionUnion Ridge 230kV
CountyDickinson
StateKS
Voltage230 kV
Capacity300 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2018-12-17
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dickinson, KS: 3 requests in the SPP queue, 3 active totaling 634.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2015-002-7; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2015-09-21
Operational date2018-12-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first