SPP request GEN-2012-001

SPP queue ID GEN-2012-001

Queue request GEN-2012-001 was listed in the SPP interconnection queue at the end of 2025 as a 61.2 MW wind project in Lynn County, TX, according to Berkeley Lab’s queue data file. The filing names Tap Grassland ¬Å- Borden County as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 21, 2012.

Queue IDGEN-2012-001
Project nameNot reported
Status (as published)Operational
SubstationTap Grassland - Borden County
Point of interconnectionTap Grassland - Borden County 230 kv
CountyLynn
StateTX
Voltage230 kV
Capacity61.2 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2012-12-21
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lynn, TX: 4 requests in the SPP queue, 1 active totaling 61.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2012-001-4; 05 SOUTHWEST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2012-03-08
Operational date2012-12-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.