SPP request GEN-2008-002

SPP queue ID GEN-2008-002

Queue request GEN-2008-002 was listed in the SPP interconnection queue at the end of 2025 as a 65 MW coal project in Platte County, MO, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 12, 2009.

Queue IDGEN-2008-002
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyPlatte
StateMO
VoltageNot reported
Capacity65 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2009-04-12
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Platte, MO: 6 requests in the SPP queue, 3 active totaling 965 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityKACP
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2008-01-22
Operational date2009-04-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.