Substation Scout

SPP request GEN-2006-024S

SPP queue ID GEN-2006-024S

Queue request GEN-2006-024S was listed in the SPP interconnection queue at the end of 2025 as a 18.9 MW wind project in Harper County, OK, according to Berkeley Lab’s queue data file. The filing names Buffalo Bear Tap as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2008.

Queue IDGEN-2006-024S
Project nameNot reported
Status (as published)Operational
SubstationBuffalo Bear Tap
Point of interconnectionBuffalo Bear Tap 69kV
CountyHarper
StateOK
Voltage69 kV
Capacity18.9 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2008-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Harper, OK: 9 requests in the SPP queue, 3 active totaling 562.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterICS-2008-001 Prior Queued; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2006-07-07
Operational date2008-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first