Substation Scout

SPP request GEN-2002-023N

SPP queue ID GEN-2002-023N

Queue request GEN-2002-023N was listed in the SPP interconnection queue at the end of 2025 as a 0.8 MW wind project in Hamilton County, NE, according to Berkeley Lab’s queue data file. The filing names Harmony as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDGEN-2002-023N
Project nameNot reported
Status (as published)Operational
SubstationHarmony
Point of interconnectionHarmony 115kV
CountyHamilton
StateNE
Voltage115 kV
Capacity0.8 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hamilton, NE: 2 requests in the SPP queue, 1 active totaling 0.8 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNPPD
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2002-09-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first