Substation Scout

SPP request ERAS-2025-003

SPP queue ID ERAS-2025-003

Queue request ERAS-2025-003 was listed in the SPP interconnection queue at the end of 2025 as a 186 MW gas project in Oklahoma County, OK, according to Berkeley Lab’s queue data file. The filing names Redbud Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 24, 2025.

Queue IDERAS-2025-003
Project nameNot reported
Status (as published)Active
SubstationRedbud Substation
Point of interconnectionRedbud 345kV Substation
CountyOklahoma
StateOK
Voltage345 kV
Capacity186 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2025-10-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Redbud Substation substation: 2 requests in the SPP queue, 1 active totaling 186 MW.

Queue IDProjectMWResourceStatus
GEN-2024-292Not reported186GasWithdrawn

Oklahoma, OK: 33 requests in the SPP queue, 19 active totaling 5,200.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterERAS-2025-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)ERAS
Queue date2025-09-10
Operational date2025-10-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first