Woods, OK interconnection queue
5 active projects totaling 1,230 MW in the SPP queue, plus 3 with terminal status (shown grayed).
5active projects
1,230active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2023-102 | Not reported | 345 | 475 | Hybrid | Active |
| GEN-2023-100 | Not reported | 345 | 300 | Hybrid | Withdrawn |
| GEN-2024-134 | Not reported | 345 | 250 | Wind | Active |
| GEN-2024-135 | Not reported | 345 | 250 | Wind | Active |
| GEN-2015-095 | Not reported | 138 | 176 | Wind | Withdrawn |
| GEN-2019-045 | Not reported | 138 | 155 | Solar | Active |
| GEN-2023-104 | Not reported | 138 | 100 | Hybrid | Active |
| GEN-2019-046 | Not reported | 138 | 90 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.