Wilson, KS interconnection queue

1 active project totaling 65 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
65active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-248 Not reported 345 721.2 Gas Withdrawn
GEN-2017-022 Not reported 138 65 Solar Active
GEN-2017-131 Not reported 138 29.6 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.