Substation Scout

Wibaux, MT interconnection queue

2 active projects totaling 235 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2active projects
235active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-069 Not reported 230 125 Wind Active
GEN-2019-023 Not reported 230 110 Hybrid Active
GEN-2015-098 Not reported 230 100 Wind Withdrawn
GEN-2019-024 Not reported n/r 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.