Wayne, NE interconnection queue
5 active projects totaling 895 MW in the SPP queue, plus 7 with terminal status (shown grayed).
5active projects
895active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-201 | Not reported | 345 | 250 | Wind | Active |
| GEN-2016-043 | Not reported | 345 | 230 | Wind | Operational |
| GEN-2013-039 | Not reported | 115 | 160 | Wind | Withdrawn |
| GEN-2014-055 | Not reported | 115 | 160 | Wind | Withdrawn |
| GEN-2015-007 | Not reported | 345 | 160 | Wind | Operational |
| GEN-2023-SR7 | Not reported | 345 | 135 | Battery | Active |
| GEN-2011-027 | Not reported | 230 | 120 | Wind | Operational |
| GEN-2023-SR6 | Not reported | 345 | 100.2 | Solar | Withdrawn |
| GEN-2006-038N011 | Not reported | n/r | 100 | Wind | Withdrawn |
| GEN-2010-026 | Not reported | 230 | 99 | Wind | Withdrawn |
| GEN-2022-044 | Not reported | 345 | 80 | Battery | Withdrawn |
| GEN-2018-012 | Not reported | 345 | 74.1 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.