Wagoner, OK interconnection queue

3 active projects totaling 600.7 MW in the SPP queue, plus 5 with terminal status (shown grayed).

3active projects
600.7active MW
8total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-180 Not reported 345 250 Solar Withdrawn
GEN-2017-141 Not reported 345 241.7 Solar Active
GEN-2017-122 Not reported 345 234 Wind Withdrawn
GEN-2017-143 Not reported 345 227 Wind Withdrawn
GEN-2017-129 Not reported 345 222 Wind Withdrawn
GEN-2024-118 Not reported 138 199 Battery Active
GEN-2017-140 Not reported 345 160 Solar Active
GEN-2017-170 Not reported 345 52 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.