Titus, TX interconnection queue

1 active project totaling 200 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-055 Not reported 345 240 Solar Withdrawn
GEN-2021-038 Not reported 345 200 Battery Active
GEN-2023-227 Not reported 138 200 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.