0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-077 Not reported 115 151.2 Wind Withdrawn
GEN-2023-040 Not reported 115 105 Solar Withdrawn
GEN-2021-106 Not reported 115 102.1 Solar Withdrawn
GEN-2015-087 Not reported 115 66 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.