Substation Scout

Terry, TX interconnection queue

2 active projects totaling 502.5 MW in the SPP queue, plus 8 with terminal status (shown grayed).

2active projects
502.5active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-068 Not reported 345 400 Solar Withdrawn
GEN-2020-067 Not reported 345 352.5 Wind Active
GEN-2006-030 Not reported n/r 150 Wind Withdrawn
GEN-2007-004 Not reported n/r 150 Wind Withdrawn
GEN-2017-187 Not reported 115 150 Solar Active
GEN-2021-054 Not reported 115 150 Solar Withdrawn
GEN-2016-090 Not reported 115 100 Solar Withdrawn
GEN-2016-077 Not reported 69 54 Solar Withdrawn
GEN-2014-044 Not reported 115 50 Solar Withdrawn
GEN-2018-086 Not reported 115 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first