Substation Scout

Stark, ND interconnection queue

2 active projects totaling 325 MW in the SPP queue, plus 5 with terminal status (shown grayed).

2active projects
325active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-220 Not reported 230 250 Solar Withdrawn
GEN-2023-198 Not reported 230 250 Solar Withdrawn
GEN-2024-326 Not reported 230 225 Battery Active
GEN-2015-091 Not reported 230 101.2 Wind Withdrawn
GEN-2024-359 Not reported 345 100 Battery Active
GEN-2016-066 Not reported 230 13 Wind Withdrawn
GEN-2016-065 Not reported 230 6.8 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.