Smith, KS interconnection queue

1 active project totaling 300 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
300active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-055 Not reported n/r 300 Wind Withdrawn
GEN-2024-016 Not reported 345 300 Wind Active
GEN-2011-001 Not reported 345 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.