Slope, ND interconnection queue

1 active project totaling 250 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
250active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-160 Not reported 230 300 Hybrid Withdrawn
GEN-2024-328 Not reported 230 250 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.