Substation Scout

Sherman, TX interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-072 Not reported 345 1,000 Wind Withdrawn
GEN-2005-017 Not reported n/r 340 Wind Withdrawn
GEN-2023-010 Not reported 230 280 Wind Withdrawn
GEN-2013-001 Not reported 230 200 Wind Withdrawn
GEN-2007-024 Not reported n/r 120 Wind Withdrawn
GEN-2011-012 Not reported 345 104.5 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.