0 active projects
totaling 0 MW in the SPP queue, plus 6 with terminal status (shown grayed).
0active projects
0active MW
6total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2009-072
Not reported
345
1,000
Wind
Withdrawn
GEN-2005-017
Not reported
n/r
340
Wind
Withdrawn
GEN-2023-010
Not reported
230
280
Wind
Withdrawn
GEN-2013-001
Not reported
230
200
Wind
Withdrawn
GEN-2007-024
Not reported
n/r
120
Wind
Withdrawn
GEN-2011-012
Not reported
345
104.5
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.