Sherman, KS interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-045 Not reported 345 300 Wind Withdrawn
GEN-2008-025 Not reported 115 101.2 Wind Withdrawn
GEN-2006-034 Not reported 115 81 Wind Withdrawn
GEN-2007-003 Not reported n/r 30 Coal Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.