Shawnee, KS interconnection queue

2 active projects totaling 300 MW in the SPP queue, plus 4 with terminal status (shown grayed).

2active projects
300active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-193 Not reported 230 201.6 Solar Withdrawn
GEN-2024-182 Not reported 115 199 Battery Withdrawn
GEN-2024-183 Not reported 115 199 Battery Withdrawn
GEN-2024-276 Not reported 230 150 Battery Active
GEN-2024-277 Not reported 230 150 Battery Active
GEN-2017-194 Not reported 230 52 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first