Shawnee, KS interconnection queue
2 active projects totaling 300 MW in the SPP queue, plus 4 with terminal status (shown grayed).
2active projects
300active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2017-193 | Not reported | 230 | 201.6 | Solar | Withdrawn |
| GEN-2024-182 | Not reported | 115 | 199 | Battery | Withdrawn |
| GEN-2024-183 | Not reported | 115 | 199 | Battery | Withdrawn |
| GEN-2024-276 | Not reported | 230 | 150 | Battery | Active |
| GEN-2024-277 | Not reported | 230 | 150 | Battery | Active |
| GEN-2017-194 | Not reported | 230 | 52 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.