Seward, KS interconnection queue

2 active projects totaling 349 MW in the SPP queue, plus 7 with terminal status (shown grayed).

2active projects
349active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2010-027 Not reported 345 900 Wind Withdrawn
GEN-2008-133 Not reported n/r 800 Wind Withdrawn
GEN-2006-049 Not reported 345 400 Wind Withdrawn
GEN-2024-218 Not reported 115 199 Hybrid Active
GEN-2018-009 Not reported 115 150 Wind Active
GEN-2021-087 Not reported 115 100 Hybrid Withdrawn
GEN-2008-080 Not reported n/r 80 Wind Withdrawn
GEN-2019-059 Not reported 115 75 Solar Withdrawn
GEN-2020-082 Not reported 115 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first