Scotts Bluff, NE interconnection queue

1 active project totaling 225 MW in the SPP queue, plus 5 with terminal status (shown grayed).

1active projects
225active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-374 Not reported 345 225 Solar Active
GEN-2018-036 Not reported 230 200 Battery Withdrawn
GEN-2022-061 Not reported 230 180 Solar Withdrawn
GEN-2016-093 Not reported 115 70 Solar Withdrawn
GEN-2017-037 Not reported 115 20 Solar Withdrawn
GEN-2007-012N Not reported n/r 8.5 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.