Scott, KS interconnection queue

4 active projects totaling 1,300 MW in the SPP queue, plus 14 with terminal status (shown grayed).

4active projects
1,300active MW
18total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-136 Not reported 345 400 Solar Active
GEN-2024-108 Not reported 345 301.5 Wind Withdrawn
GEN-2008-017 Not reported 345 300 Wind Withdrawn
GEN-2024-137 Not reported 345 300 Wind Active
GEN-2024-138 Not reported 345 300 Wind Active
GEN-2024-144 Not reported 345 300 Wind Active
GEN-2023-045 Not reported 345 250 Wind Withdrawn
GEN-2023-046 Not reported 345 250 Wind Withdrawn
GEN-2023-047 Not reported 345 250 Wind Withdrawn
GEN-2023-048 Not reported 345 250 Wind Withdrawn
GEN-2022-123 Not reported 115 200 Solar Withdrawn
GEN-2022-124 Not reported 115 200 Solar Withdrawn
GEN-2023-043 Not reported 345 200 Solar Withdrawn
GEN-2023-044 Not reported 345 200 Solar Withdrawn
GEN-2008-119 Not reported n/r 179.4 Wind Withdrawn
GEN-2008-117 Not reported n/r 161 Wind Withdrawn
GEN-2008-118 Not reported n/r 161 Wind Withdrawn
GEN-2012-002 Not reported 115 101.2 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.