Sarpy, NE interconnection queue

3 active projects totaling 782.7 MW in the SPP queue, plus 8 with terminal status (shown grayed).

3active projects
782.7active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-024 Not reported 161 424.5 Gas Withdrawn
GEN-2020-031 Not reported 161 272.7 Gas Active
GEN-2020-025 Not reported 161 255 Gas Operational
GEN-2020-028 Not reported 161 255 Gas Operational
GEN-2020-026 Not reported 161 56.5 Gas Withdrawn
GEN-2020-029 Not reported 161 56.5 Gas Withdrawn
GEN-2020-032 Not reported 161 56.5 Gas Withdrawn
GEN-2020-034 Not reported 161 56.5 Gas Withdrawn
GEN-2020-027 Not reported 161 50 Hybrid Withdrawn
GEN-2020-030 Not reported 161 50 Hybrid Withdrawn
GEN-2020-033 Not reported 161 50 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.