Saline, NE interconnection queue

1 active project totaling 300 MW in the SPP queue, plus 4 with terminal status (shown grayed).

1active projects
300active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-121N01 Not reported n/r 400 Wind Withdrawn
GEN-2015-088 Not reported 345 300 Wind Operational
GEN-2022-162 Not reported 115 118 Wind Withdrawn
GEN-2014-039 Not reported 115 73.4 Wind Withdrawn
GEN-2017-085 Not reported 115 0.6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.