Rush, KS interconnection queue

3 active projects totaling 210.7 MW in the SPP queue, plus 12 with terminal status (shown grayed).

3active projects
210.7active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-049 Not reported 345 310.2 Wind Withdrawn
GEN-2017-063 Not reported 345 202.1 Wind Withdrawn
GEN-2014-072 Not reported 345 200 Wind Withdrawn
GEN-2022-158 Not reported 345 200 Solar Withdrawn
GEN-2010-016 Not reported n/r 199.8 Wind Withdrawn
GEN-2024-085 Not reported 115 160 Solar Active
GEN-2009-026 Not reported 345 102 Wind Withdrawn
GEN-2009-043 Not reported 345 102 Wind Withdrawn
GEN-2009-051 Not reported 345 102 Wind Withdrawn
GEN-2009-052 Not reported 345 102 Wind Withdrawn
GEN-2013-041 Not reported n/r 100 Wind Withdrawn
GEN-2013-010 Not reported 345 99 Wind Withdrawn
GEN-2009-020 Not reported 69 48.3 Wind Operational
GEN-2009-019S Not reported 69 19.5 Wind Withdrawn
GEN-2014-025 Not reported 69 2.4 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.