Rush, KS interconnection queue
3 active projects totaling 210.7 MW in the SPP queue, plus 12 with terminal status (shown grayed).
3active projects
210.7active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2016-049 | Not reported | 345 | 310.2 | Wind | Withdrawn |
| GEN-2017-063 | Not reported | 345 | 202.1 | Wind | Withdrawn |
| GEN-2014-072 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2022-158 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2010-016 | Not reported | n/r | 199.8 | Wind | Withdrawn |
| GEN-2024-085 | Not reported | 115 | 160 | Solar | Active |
| GEN-2009-026 | Not reported | 345 | 102 | Wind | Withdrawn |
| GEN-2009-043 | Not reported | 345 | 102 | Wind | Withdrawn |
| GEN-2009-051 | Not reported | 345 | 102 | Wind | Withdrawn |
| GEN-2009-052 | Not reported | 345 | 102 | Wind | Withdrawn |
| GEN-2013-041 | Not reported | n/r | 100 | Wind | Withdrawn |
| GEN-2013-010 | Not reported | 345 | 99 | Wind | Withdrawn |
| GEN-2009-020 | Not reported | 69 | 48.3 | Wind | Operational |
| GEN-2009-019S | Not reported | 69 | 19.5 | Wind | Withdrawn |
| GEN-2014-025 | Not reported | 69 | 2.4 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.