13 active projects totaling 3,247.5 MW in the SPP queue, plus 25 with terminal status (shown grayed).

13active projects
3,247.5active MW
38total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-093 Not reported n/r 525 Wind Withdrawn
GEN-2024-301 Not reported 345 500 Hybrid Withdrawn
GEN-2024-302 Not reported 345 500 Hybrid Withdrawn
GEN-2024-303 Not reported 345 500 Hybrid Active
GEN-2024-304 Not reported 345 500 Hybrid Active
GEN-2024-221 Not reported 345 400 Wind Active
GEN-2024-222 Not reported 345 400 Wind Withdrawn
GEN-2016-076 Not reported 345 396 Wind Withdrawn
GEN-2021-097 Not reported 230 300 Hybrid Withdrawn
GEN-2024-159 Not reported 230 300 Solar Active
GEN-2008-069 Not reported n/r 298.5 Wind Withdrawn
GEN-2016-123 Not reported 345 298 Wind Operational
ERAS-2025-018 Not reported 230 256 Hybrid Active
GEN-2015-010 Not reported 230 250.7 Wind Withdrawn
GEN-2005-004 Not reported n/r 250 Wind Withdrawn
GEN-2024-043 Not reported 345 250 Wind Active
GEN-2024-350 Not reported 230 250 Hybrid Withdrawn
GEN-2024-357 Not reported 230 250 Solar Withdrawn
GEN-2013-013 Not reported 345 248.4 Wind Withdrawn
GEN-2016-086 Not reported 230 240 Solar Withdrawn
GEN-2017-078 Not reported 345 220 Wind Withdrawn
GEN-2008-058 Not reported n/r 201 Wind Withdrawn
GEN-2008-064 Not reported n/r 201 Wind Withdrawn
GEN-2012-043 Not reported n/r 200 Wind Withdrawn
GEN-2023-178 Not reported 230 200 Solar Withdrawn
GEN-2024-092 Not reported 115 199.5 Battery Active
GEN-2020-063 Not reported 230 184 Solar Withdrawn
GEN-2016-124 Not reported 345 150 Wind Operational
GEN-2019-003 Not reported 230 150 Solar Active
GEN-2025-GR2 Not reported 230 120 Wind Active
GEN-2015-056 Not reported 345 101.2 Other Withdrawn
GEN-2015-020 Not reported 115 100 Solar Withdrawn
GEN-2024-354 Not reported 115 100 Battery Withdrawn
GEN-2024-002 Not reported 115 90 Solar Withdrawn
GEN-2016-125 Not reported 345 74 Wind Operational
GEN-2017-102 Not reported 345 67.5 Solar Withdrawn
GEN-2019-021 Not reported 230 50 Solar Active
GEN-2014-047 Not reported 345 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.