Substation Scout

Rogers, OK interconnection queue

3 active projects totaling 745 MW in the SPP queue, plus 6 with terminal status (shown grayed).

3active projects
745active MW
9total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-004 Not reported n/r 620 Coal Withdrawn
GEN-2006-005 Not reported n/r 580 Coal Withdrawn
ERAS-2025-023 Not reported 345 510 Gas Active
GEN-2024-087 Not reported 345 510 Gas Withdrawn
GEN-2022-234 Not reported 138 200 Solar Withdrawn
GEN-2023-103 Not reported 138 200 Battery Withdrawn
GEN-2023-063 Not reported 138 135 Hybrid Active
GEN-2022-001 Not reported 138 100 Battery Withdrawn
GEN-2024-SR16 Not reported 138 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.