Roger Mills, OK interconnection queue

2 active projects totaling 129.1 MW in the SPP queue, plus 11 with terminal status (shown grayed).

2active projects
129.1active MW
13total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-042 Not reported 345 414 Wind Withdrawn
GEN-2016-082 Not reported n/r 300 Wind Withdrawn
GEN-2022-138 Not reported 345 300 Battery Withdrawn
GEN-2008-077 Not reported n/r 220 Wind Withdrawn
GEN-2018-117 Not reported 230 150 Solar Withdrawn
GEN-2007-014 Not reported n/r 135 Wind Withdrawn
GEN-2002-005 Not reported 138 123 Wind Operational
GEN-2008-040 Not reported n/r 120 Wind Withdrawn
GEN-2022-134 Not reported 345 90 Battery Withdrawn
GEN-2010-012 Not reported 138 65 Wind Withdrawn
GEN-2019-013 Not reported 230 50 Battery Withdrawn
GEN-2002-025 Not reported n/r 40 Wind Withdrawn
GEN-2016-132 Not reported 230 6.1 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.