Substation Scout

Reno, KS interconnection queue

2 active projects totaling 967.8 MW in the SPP queue, plus 3 with terminal status (shown grayed).

2active projects
967.8active MW
5total filed
Queue IDProjectkVMWResourceStatus
ERAS-2025-006 Not reported 345 717.8 Gas Active
GEN-2024-027 Not reported 345 717.8 Gas Withdrawn
GEN-2024-176 Not reported 115 250 Battery Active
GEN-2008-096 Not reported n/r 100 Wind Withdrawn
GEN-2008-097 Not reported n/r 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.